Seine-North Europe Canal project

Our partner, Artelia was involved in the development of the LNG Terminal in Dunkirk, France.
Context & Issues
- LNG import terminal designed for 10 million m3 of gas per year.
- Constraints linked with the existing situation and port operations.
- 450 m long LNG berth designed for 65 000 to 267 000 m3 LNG vessels (Qmax).
- Reclaimed platform used for the LNG plant with shore protection.
- Water intake (tunnel under the outer harbour area), pumping station and outfall.